20 Midtown

This is a prominent $240M project with 985,000 SF largest mixed-use development that connects UAB and the City Center with ground-floor retailers such as Publix and several others. It includes parking, 436 apartments, and amenities. BHATE provided all geotechnical, environmental (ADEM VCP program approval) and CMT/SI services. The buildings are supported on a combination of … Read More

Portico at Perdido Condominium

This is an 11-story boutique building with 27-units, on a 195-feet low-density beachfront. A significant change in subsurface conditions was noted during our geotechnical exploration through approximately the center of the building footprint. Defining these conditions pre-design and verification during load testing prior to construction commencement saved significant time and cost. BHATE also provided CMT … Read More

Palazzo Beach Condominiums

This is a 21 story, 356,000 SF beachfront condominium tower including a four-level concrete frame parking deck. The building is supported on ACIP piles. BHATE provided all geotechnical, CMT, and Florida Threshold Inspections for this high-quality project.

Majestic Beach Towers

Majestic Beach Towers – The 23-story tall buildings were completed in 2006. With 523 combined units, the development also includes a parking structure across the street. The building is supported on ACIP piles. BHATE provided all geotechnical, CMT, and Florida Threshold Inspections for this high-quality project.

LIV Parkside

LIV Parkside is located across the street from Railroad Park and down the block from just east of Barons Regions Field. The 347,000 square-foot project has 228 luxury apartments and retail spaces. This was one of the most complex geotechnical sites underlain by some of the worst karst conditions. Known sinkholes and dropouts had been … Read More

Park 35 on Clairmont

This is a 271-unit multistory apartment complex bordering the Highland Park Golf Course in Birmingham, Alabama. The site topography required a 30’+ excavation adjacent to the street for construction of the building and parking structure which presented unique challenges due to adjacent 50+ year old homes. BHATE worked closely with the developer, design team, and … Read More