Valley Creek WWTP

In 2006, a major failure and damage occurred at the pump station due to hydrostatic uplift of the concrete structure which was 120' below grade. To verify 'as built' construction conditions, BHATE provided ground penetrating radar (GPR) scanning to locate and document the reinforcing in slabs, columns and walls.

This information was used by the structural engineer to repair and rehabilitate the pump station.